ON-SITE HYDROGEN SYSTEMS
Your Engineering Partner for On-Site Hydrogen
We design, build, commission and support hydrogen generation plants inside your facility — engineered for purity, uptime and total cost per Nm³ that cylinder supply cannot match.
CONFIDENTIAL · NO-OBLIGATION · ENGINEER-LED
40+
Years of engineering heritage
12–20 weeks
Order to commissioning
99.9997%
Delivered hydrogen purity
8
Industries served
WHY ON-SITE
Hydrogen where you use it. Not where you buy it.
Lower cost per Nm³
Generate at point of use and remove cylinder logistics, rentals and price escalation from your operating cost.
Supply you control
No stock-outs, no transporter dependence. Hydrogen availability becomes a plant utility, not a procurement risk.
Safer by design
Low on-site inventory, engineered ventilation and interlocks, and systems designed to comply with Indian statutory requirements including PESO.
Lower emissions
Renewable-powered electrolysis reduces Scope 1 and Scope 2 emissions — green manufacturing your customers and regulators can see.
APPLICATION
Serving the Industries That Cannot Afford to Stop
SPAN Hydrogen delivers on-site hydrogen generation systems across eight high-demand industrial sectors.
Pharmaceuticals
API synthesis, hydrogenation, reduction reactions
Continuous manufacturing compliance
Specialty Chemicals
Catalytic hydrogenation, synthesis gas
Feedstock independence
Steel & Metals
Direct reduction iron, annealing atmospheres
Decarbonised heat treatment
Glass
Float glass production, surface finishing
Controlled atmosphere furnaces
Electronics
Semiconductor fab, clean process gas
Ultra-pure atmosphere control
Mobility
Fuel cell vehicle refuelling stations
Green hydrogen dispensing
Food Processing
Edible oil hydrogenation, modified atmosphere
Consistent purity for food grade
Research & Labs
Analytical instruments, R&D facilities
On-demand lab-grade hydrogen
PHARMA FOCUS
Hydrogen is Critical to Pharmaceutical Manufacturing
India's pharmaceutical industry is among the largest in the world. Hydrogen is a critical process gas in API synthesis, hydrogenation reactions and catalytic processes — where purity, consistency and continuous supply are non-negotiable.
Hydrogenation
Saturation of double bonds in organic synthesis for API intermediates.
Reduction Reactions
Converting nitro groups to amines in pharmaceutical synthesis.
Catalytic Processes
Palladium and platinum-catalysed reactions requiring ultra-pure H₂.
Continuous Manufacturing
Uninterrupted hydrogen supply for 24/7 production lines.
Regulatory Compliance
Consistent purity documentation for GMP and FDA requirements.
On-site systems eliminate batch-to-batch purity variation — a critical quality advantage.
VALUE PROPOSITION
The Economics of On-Site Generation
SPAN on-site hydrogen systems deliver measurable operational, financial and sustainability advantages from day one.
On-Site Generation
Hydrogen produced where it is consumed. Zero transport dependency.
Lower Operating Cost
Eliminate cylinder purchase, delivery and handling costs.
Continuous Supply
24/7 on-demand production. No stockouts, no delays.
Consistent Purity
99.9997% purity, every batch, every day.
ESG Compliance
Green hydrogen reduces Scope 1 and Scope 2 emissions.
Safety
Eliminate high-pressure cylinder storage and handling risks.
Green Manufacturing
Demonstrate environmental leadership to customers and regulators.
Long-Term Partnership
SPAN Hydrogen provides AMC, remote monitoring and lifecycle support.
SUPPLY ROUTES
The same molecule. Two operating models.
What changes when hydrogen stops arriving on a truck and starts being generated beside the process that uses it.
| Dimension | Cylinder / merchant supply | On-site generation |
|---|---|---|
| Cost per Nm³ | Carries logistics, rentals and price escalation | Generated at point of use |
| Supply control | Depends on transporters and stock levels | A plant utility under your control |
| On-site inventory | High-pressure cylinder banks on site | Low inventory by design |
| Purity | As delivered | Up to 99.999% at your outlet |
| Compliance | Handling and storage of bulk deliveries | Engineered to Indian statutory requirements including PESO |
The Readiness Assessment puts your plant's numbers against both columns. Request it
SOLUTIONS
One partner across the hydrogen block.
Storage, Compression & Distribution
Buffer storage, cascades and piping engineered end to end.
View solutionBalance of Plant & Integration
Power, water, cooling, instrumentation and PLC/SCADA integration.
View solutionSafety & Compliance Engineering
HAZOP support, layout studies and statutory documentation.
View solutionPROCESS
Consultative from the first site visit.
It begins with a conversation, not a quotation.
-
01
Discover
Site visit, process audit and hydrogen demand assessment.
-
02
Design
System engineering, P&ID, equipment selection and proposal.
-
03
Manufacture
Electrolyser procurement, skid fabrication and factory testing.
-
04
Install
Civil preparation, mechanical installation and electrical connection.
-
05
Commission
System startup, performance validation and operator training.
-
06
Support
AMC, remote monitoring, spares and lifecycle management.
Typical project timeline: 12–20 weeks from order to commissioning.
Start with a Readiness AssessmentINDUSTRIES
Built for continuous-process industry.
Glass & Float Glass
99.999% purity · continuous duty
Metals & Heat Treatment
stable flow control · low dew point
Electronics & Semiconductors
99.999%+ · ppm-level O₂/H₂O control
Chemicals & Pharma
pressure stability · GMP-aware documentation
Edible Oils & Food
food-grade practice · compact footprint
Power Plants
generator-cooling purity · remote-site reliability
Green Mobility EMERGING
350/700-bar readiness pathway · phased capacity
Research & Labs
lab-grade purity · on-demand supply
If hydrogen touches your process, we have engineered for a plant like yours. Explore all industries
QUESTIONS
Questions plant teams ask.
FOR DECISION-MAKERS
The Executive Handbook on On-Site Hydrogen.
A concise brief for CXOs and plant leadership — economics, technology options, safety and a transition roadmap. Written by engineers, not marketers.
Is your plant ready for on-site hydrogen?
A structured, confidential assessment of your hydrogen demand, economics and site readiness — reviewed by our engineers within 2 business days.
NO COST · NO OBLIGATION